
In 2025, the Group continued to monitor the performance of the solar rooftop system at the Ban Wang Khon Kwang Child Development Center in Lopburi Province. Following its installation in 2023, the Group conducts semi-annual equipment inspections and evaluates electricity cost savings to ensure sustained power generation efficiency.
Furthermore, in 2024, the Group expanded the Light for Life Project to three additional locations: Nakha Wittaya School, Khua Kai Subdistrict Administrative Organization (SAO), and Wat Tha Samran in Sakon Nakhon Province. This expansion aims to enhance energy equity and broaden access to clean energy for public facilities and community spaces.
Performance Results: Solar Rooftop Installations
| Site | Installation Area (m2) | Installed Capacity | Energy Generation 2025 (kWh) | Energy Value 2025 (THB) | Avg. Monthly Savings (THB) | GHG Emissions Reduction (kgCO2e/year) |
|---|---|---|---|---|---|---|
| Nakha Wittaya School, Sakon Nakhon | 19 | 4.27 kW | 2,990 | 14,258 | 1,188 | 1,420.25 |
| Khua Kai, Sakon Nakhon | 49 | 9.76 kW | 11,900 | 57,340 | 4,778 | 5652.50 |
| Wat Tha Samran, Sakon Nakhon | 14 | 3.05 kW | 809 | 3,713 | 309 | 384.28 |
| Ban Wang Khon Kwang Child Development Center, Lopburi | 62 | 13.32 kW | 14,796.30 kW | 71,342.81 | 5,945 | 7,546.113 |